Skip to content
The FlexiBake Platform · Production

Production Planning & Scheduling Software for Food Manufacturers

Stop rebuilding the production plan from scratch every morning. FlexiBake turns your orders into a sequenced schedule with equipment allocation, shift planning, and capacity constraints.

Order-driven
scheduling
Shift-aware
capacity planning
Equipment-level
allocation
The Problem

If one person can't come in tomorrow, does your production plan exist? When scheduling lives in someone's head — supported by a spreadsheet nobody else understands — your entire operation has a single point of failure.

Without FlexiBake
  • One person builds the daily plan before anyone else arrives. If they're out, the team improvises.
  • Equipment allocation is mental math — who knows which mixer is available when?
  • No visibility into whether you have capacity for a rush order until you try to fit it in
  • Changeover time between products isn't tracked
  • Shift handoffs mean re-explaining the plan verbally or leaving notes on a whiteboard
With FlexiBake
  • Orders generate a draft schedule automatically, sequenced by route deadlines and equipment constraints
  • Equipment and line allocation visible on screen — no mental math, no double-booking
  • Capacity gaps and conflicts flagged before they become problems
  • Changeover time built into scheduling so the plan reflects reality
  • The schedule is in the system. Every shift can see what's planned, what's running, and what's next.
Key Capabilities

What Planning & Scheduling does for your operation

Order-Driven Scheduling

FlexiBake generates production schedules from open orders — standing and one-off. Products are sequenced by route departure times, shelf-life requirements, and production dependencies.

Screenshot

Equipment & Line Allocation

Assign batches to specific equipment and production lines. FlexiBake tracks availability, prevents double-booking, and accounts for changeover time between products.

Screenshot

Shift Planning

Define production shifts and assign planned output to each. When the night shift finishes mixing and the morning shift starts baking, both see the same plan with clear handoff points.

Screenshot

Capacity Planning

When a new customer wants to start next week, or an existing account doubles their holiday order, FlexiBake shows available capacity by equipment, line, and shift.

Screenshot

Material Requirements Planning

Once the production schedule is set, FlexiBake calculates ingredient requirements from your recipes. What you need, how much, and when — cross-referenced against current inventory.

Screenshot

Ready to see Planning & Scheduling in action?

Book a 30-minute demo tailored to your operation.